Strict Camp Facility Checklist UAE: BAF Prefab House

Ensure zero-tolerance MoHRE compliance with the Strict Camp Facility Checklist, UAE, from BAF Prefab House. This comprehensive audit tool verifies all labor camp requirements for 50-5000+ workers across Dubai, Abu Dhabi, and Sharjah construction sites, eliminating AED 100,000+ fines, shutdowns, and delays through systematic daily/weekly verifications.

Daily Hygiene & Sanitation Checklist
Camp facility checklist mandates 1 toilet/15 males, 1/10 females operational with hot water (45°C) 12 hours daily. Verify 1 shower/20 workers flowing 10L/min, 1 wash basin/10 with soap dispensers refilled. Check sewage tanks below 80% capacity, UV water dispensers delivering 20L/person/day, and pest traps empty (no droppings).

Laundry machines (1/50 workers) spin 8kg loads while drying lines provide 2m/worker. Potable water tanks test 500L minimum storage with chlorine levels 0.5-1ppm. Waste bins segregate 100% recyclables while deep cleaning logs confirm non-slip floors dry across wet areas.

Weekly Structural & Safety Verification
Inspect BAF camp facilities for 2.4m ceiling heights, 1.2m corridors clear, and emergency exits unobstructed every 15m. Test 4kg ABC extinguishers (pressure 12bar), smoke detectors (beeps monthly), sirens reaching 85dB/500m. Fire hydrants flow 30L/min across 100m while muster points mark 100% capacity.

Check 160km/h wind bracing, 3kN/sqm load capacity, DM Grade A certification current. Electrical RCDs trip <0.1s, 32A boards balance <80% load, LED lighting hits 300lux workstations. HVAC maintains 22-26°C with 12 air changes/hour verified by CO2 meters below 1000ppm.

Daily Welfare & Admin Compliance
Verify prayer rooms (4sqm/50 workers) are clean with Qibla markers, grievance boxes are emptied daily (90% resolution <48hrs). Strict checklist confirms biometric attendance 99.8% uptime, passport safes locked (fireproof 1hr rating), medical clinics stocked AED 5,000 kits with nurse present 24/7.